ISO Consultant in Kuwait

A procedure for Change Management

Advertisements

1. SCOPE

The purpose of this procedure is to define the methods for managing changes to processes and other aspects of the management system in a controlled manner so as to maintain the integrity of the QMS and the organization’s ability to continue to provide conforming products and services during the change.

2. PURPOSE

This procedure applies to all the activities within the scope of the XXX Quality Management System.

3. REFERENCE DOCUMENTS

3.1 XXX Quality Manual,

4. TERMS & DEFINITIONS
CM- Change Management
R-Risk
O-Opportunity
SOP- Standard Operating System

5. RESPONSIBILITY AND AUTHORITY

The Management Representative (MR) and HOD’s of all departments are responsible for the effective implementation of this procedure.

6. DETAILS OF PROCEDURE

6.1. Properly planning a change by applying risk-based thinking can help to avoid negative consequences such as rework or cancellation or postponement of service; it can also result in positive consequences such as reduction of nonconforming outputs; or reduced incidents of human error

6.2 Management system processes will undergo changes, typically when:

6.3 In such cases, the process must be changed in a controlled manner to ensure proper authorization and implementation of the changes.
6.4 Formal changes to process outputs will be used when the change is significant. Minor changes may be made without formal control, however, the decision on what constitutes significant vs minor change must be agreed upon by those involved in the change. If a customer indicates a change is significant, this will trump any internal decision.
6.5 At a minimum, process changes shall include the steps herein:

6.6 Before authorizing the implementation of changes, the following points shall be verified;

6.7 The change shall be reviewed by appropriate management, including the HOD responsible for the process. Changes must be approved prior to implementation. CEO is authorized to approve the implementation of proposed changes.
6.8 Upon implementation of change, MR shall verify the following.

6.9 All Changes must be logged as per Change Log. (QMS F 014)

7. RETAINED DOCUMENTED INFORMATION

7.1 Change Management Request(QMS F 013)
7.12Change Log(QMS F 014)

Subscribe to get access

Read more of this content when you subscribe today.

Advertisements

Advertisements