ISO Consultant in Kuwait

Procedure for Production

Advertisements

1. SCOPE

This procedure covers all roles, responsibilities, and authorities related to the Production process at XXX.

2. PURPOSE

This procedure identifies and establishes plans for production processes that directly affect product quality. It is designed to ensure that these processes will be carried out under controlled conditions.

3. REFERENCE DOCUMENTS

3.1 XXX Quality Manual,
3.2 Procedure for Correction and Corrective Action.
3.3 Procedure for Logistics.
3.4 Procedure for QA
3.5 Procedure for Purchasing.

4.TERMS & DEFINITIONS

4.1 Quality Plan:

A quality plan is a document, or several documents, that together specify quality standards, practices, resources, specifications, and the sequence of activities relevant to a particular product, service, project, or contract.

4.2 Special process:

These are the processes, results of which cannot be fully inspected and ensured after the completion of the process.

5.0 RESPONSIBILITY AND AUTHORITY

5.1 Production Manager
5.2 Coating Production Manager
5.3 Factory General Foreman
5.4 Factory Supervisor
5.5 Store Manager & QA/QC
5.6 Packing & QC
5.7 Store Keeper
5.8 Maintenance Supervisor

6.0 DETAILS OF PROCEDURE

6.1 Quality Control

6.2 Coating

6.3 Inspection and Testing:

6.3.1 Incoming Inspection:

6.3.2  In process Inspection

6.3.3 Final Inspection

6.4 Special Processes: –

6.5 Maintenance:

6.6 Product Labeling and Identification:

6.7 Handling, Storage, Packaging, Preservation and Delivery

6.7.1 HANDLING:-

6.7.2 STORAGE

6.7.3 PRESERVATION

6.7.4 PACKAGING

6.8 Incentive Scheme

7.0 RETAINED DOCUMENTED INFORMATION

7.1 Job Order ( QMS F 088)
7.2 Production Plan( QMS F 089)
7.3 Order Entry ( QMS F 090)
7.3 Delivery Note ( QMS F 091)
7.4 Stock Level Sheet ( QMS F 092)

Subscribe to get access

Read more of this content when you subscribe today.

Advertisements

Advertisements