ISO Consultant in Kuwait

5S-Sort, Shine, Set in order,  Standardize, and Sustain

Advertisements

Implementing 5S is a fundamental first step for any manufacturing company wishing to call itself world-class. The presence of a 5S program is indicative of the commitment of senior management to workplace organization, lean manufacturing, and the elimination of Muda (Japanese for waste). The 5S program mandates that resources be provided in the required location, and be available as needed to support work activities. The five Japanese “S” words for workplace organization are:

The translated English equivalents are:

Visual Management

Visual management is a set of techniques that

  1.  expose waste so you can eliminate it and prevent it from recurring in the future,
  2. make your company’s operation standards known to all employees so they can easily follow them, and
  3. improve workplace efficiency through the organization.

Creating an organized, efficient, cleaner workplace that has clear work processes and standards helps your company lower its costs. Also, employees’ job satisfaction improves when their work environment makes it easier for them to get the job done right. Implementing these techniques involves three steps:

Using visual management techniques enables your company to do the following:

  1. Improve the “first-time-through” quality of your products or services by creating an environment that:
    • Prevents most errors and defects before they occur.
    • Detects the errors and defects that do occur and enables rapid response and correction.
    • Establishes and maintains standards for zero errors, defects, and waste.
  2.  Improve workplace safety and employee health by:
    • Removing hazards.
    • Improving communication by sharing information openly throughout the company.
    • Creating compliance with all work standards, reporting deviations, and responding quickly to problems.
  3. Improve the overall efficiency of your workplace and equipment, enabling your organization to meet customer expectations.
  4. Lower your total costs.

You can effectively gain control over your company’s manufacturing or business processes by focusing on the following areas:

It is most effective to focus on the areas listed above as they relate to six aspects of your production or business processes:

  1. The quality of incoming, in-process, and outgoing materials.
  2. Work processes and methods of operation.
  3.  Equipment, machines, and tools.
  4.  Storage, inventory, and supplies.
  5. Safety and safety training.
  6. Information sharing.

To gain control over your processes, you must understand the “three actuals”:

5S  Workplace Organization

The 5S approach exemplifies a determination to organize the workplace, keep it neat and clean, establish standardized conditions, and maintain the discipline that is needed to do the job. Numerous modifications have been made on the 5S structure. It can be reduced to 4S. It can be modified to a 5S + 1S or 6S program, where the sixth S is safety. The 5S concept requires that a discipline will be installed and maintained. There is a story of a Japanese team’s initial site visit to a prospective supplier. Before allowing the supplier to unveil their grand presentation, the Japanese visitors insisted on a tour of Gemba (the shop floor). After just a few minutes in the factory, the visitors knew that the plant was not committed to the highest level of manufacturing and terminated the visit. It is very easy to tell whether a plant is practicing a 5S program. In day-to-day operations, it is possible to have some dirt around the plant, but the visual signs of a 5S committed facility are obvious. Details of a 5S program are itemized below in a step-by-step approach.

Step 1: Sort (Organize):

Step 2: Straighten:

Step 3: Scrub (Shine and Clean)

Step 4: Standardize

Step 5: Sustain

Management commitment will determine the control and self-discipline areas for an organization. A 5S program can be set up and operational within 5 to 6 months, but the effort to maintain world-class conditions must be continuous. A well run 5S program will result in a factory that is in control.

Steps in implementing 5 S

  1. Getting started Before you begin to implement 5s techniques, make sure you do the following:
    • Elect an employee from each work team to lead the program and remove any barriers his or her team encounters along the way.
    • Train all involved employees about the 5s techniques outlined below.
    • Tell everyone in the areas of your plant or office that will be involved in the program. Also, give a “heads up” to other employees or departments that might be affected by it.
    • Create storage (“red tag”) areas for holding materials you will remove from work sites in your plant or building.
    • Create a location for supplies you will need as you progress through your visual management programs, such as tags, cleaning materials, paint, labels, masking tape, and sign materials.
    • Coordinate the program with your maintenance department and any other departments that you might need to call on for help.
    •  Make sure that all employees understand and follow your company’s safety regulations and procedures as they make changes.
  2.  Sort. Sort through the items in your work area, following the steps below. Your goal is to keep what is needed and remove everything else.
    • Reduce the number of items in your immediate work area to just what you actually need.
    •  Find appropriate locations for all these items, keeping in mind their size and weight, how frequently you use them, and how urgently you might need them.
    •  Find another storage area for all supplies that you need but do not use every day.
    •  Decide how you will prevent the accumulation of unnecessary items in the future.
    • Tape or tie red tags to all the items you remove from your work area. Place the items in a temporary “red-tag storage” area for five days. Either use the Sorting Criteria chart as shown below as a guide for disposing of items or develop your own criteria.
  3.  After five days, move any item that you haven’t needed to a central red-tag storage area for another thirty days. You can then sort through all items stored there to see if they might be of any use and throw away everything else, remembering to follow your company policy. Use a logbook to track what you do with all red-tag items.
  4. If employees disagree about what to do with some of the materials, try to resolve the conflict through discussion. They can also consult their managers about the materials’ value, current and potential use, and impact on workplace performance.
  5. Shine. Clean and “shine” your workplace by eliminating all forms of contamination, including dirt, dust, fluids, and other debris. Cleaning is also a good time to inspect your equipment to look for abnormal wear or conditions that might lead to equipment failure. Once your cleaning process is complete, find ways to eliminate all sources of contamination and to keep your workplace clean at all times. Keeping equipment clean and “shiny” should be a part of your maintenance process. Your company’s equipment maintenance training should teach the concepts of “cleaning as inspection” and “eliminating sources of contamination.” Remember that your workplace includes not just the plant floor, but your administrative, sales, purchasing, accounting, and engineering areas as well. You can clean these areas by archiving project drawings when they are completed and properly storing vendor catalogues and product information. Decide what methods (local or shared hard drives, floppy disks, or CDs) are the best for storing your electronic files.
  6. Set in order. During this step, you evaluate and improve the efficiency of your current workflow, the steps and motions employees take to perform
    their work tasks.
    1. Create a map of your workspace that shows where all the equipment and tools are currently located. Draw lines to show the steps that employees must take to perform their work tasks.
    2.  Use the map to identify wasted motion or congestion caused by excessive distances travelled, unnecessary movement, and improper placement of tools and materials.
    3. Draw a map of a more efficient workspace, showing the rearrangement of every item that needs to be moved.
    4.  On your map, create location indicators for each item. These are markers that show where and how much material should be kept in a specific place. Once you create your new workspace, you can hang up location indicators within it.e. Make a plan for relocating items that need to be moved so you can make your new, efficient workspace a reality. As you do this step, ask yourself the following questions:
      • Who will approve the plan?
      • Who will move the items?
      • Are there any rules, policies, or regulations that affect the location of these items? Will employees be able to adhere to these rules?
      • When is the best time to relocate these items?
      • Do we need any special equipment to move the items? As a team, brainstorm your ideas for new ways to layout your workspace. If it is impractical or impossible to move an item the way you would like, redesign the rest of the workspace around this item’s location.
    5. Post the drawing of the new workplace layout in your area.
  7. Standardize. Make sure that team members from every work area follow the sort, shine, and set-in order steps. Share information among teams so that there is no confusion or errors regarding:
    • Locations
    • Delivery
    • Destinations
    • Quantities
    •  Schedules
    •  Downtime
    • Procedures and standards.
  8. As you begin to use your newly organized workplace, have everyone write down their ideas for reducing clutter, eliminating unnecessary items, organizing, making cleaning easier, establishing standard procedures, and making it easier for employees to follow the rules. Once you have standardized your methods, make your standards known to everyone so that anything out of place or not in compliance with your procedure will be immediately noticed.
  9. Sustain. The gains you make during the above four steps are sustained when:
    • All employees are properly trained.
    • All employees use visual management techniques.
    • All managers are committed to the program’s success.
    • The workplace is well ordered and adheres to the new procedures all your employees have agreed upon.
    • Your new procedures become a habit for all employees. Reevaluate your workspace using the Sustain Evaluation Form (see the figure below) as needed. Encourage and recognize the achievement of all work areas that are able to sustain their visual management efforts. This helps your company to maintain a cycle of continuous improvement.

5S Implementation Guide

5S Implementation Checklist

Purpose
The purpose of this checklist is to provide reliable steps to preparing for and performing 5S activities in the work area. Included in this checklist is a preferred sequence of events and corresponding “how-to” guides for each step.

Task 5S Guide
Develop your implementation plan:   Create a 5S documentation system Determine the pace of implementation Draft “straw man” 5S Map Determine “before 5S” photo logistics Establish visible ways to communicate 5S activities Coordinate and schedule services required from support organizations Make a list of internal arrangements to be made Draft timeline Communicate your plan to upper management “Develop Implementation Plan”
Photograph the work area “Take Area Photograph”
Educate workgroup 5S Overview – Lean Training Module
Finalize 5S Map Finalize 5S Map
Perform Work Area Evaluation “Perform Area Evaluation”
Perform Sorting “Perform Tagging Technique”
“Conduct Sorting Auction”
“Prepare for Simplifying”
Perform Simplifying “Using Labeling Technique”
“Using Outlining Technique”
“Using Shadow Board Technique”
Perform Sweeping “Perform Sweeping”
Perform Standardizing “Perform Standardizing”
Perform Self-Discipline “Perform Team Self-Discipline”
“Perform Individual Self-Discipline”
Measure Results “ Measure Results”

Develop a 5S Implementation Plan

Purpose: To help work-group leaders plan for 5S implementation in their areas.
When: Prior to beginning implementation.
Materials required:

Steps to implement 5S

1. Create a 5S documentation system to organize and store pertinent data.

Notes

2. Determine the pace of implementation

Notes

IF: Then:
You allocate a full day for implementation. Schedule an entire day to conduct a 5S overview and initiate 5S activities.
Continue on a weekly or monthly basis until 5S methods become the norm.
You desire implementation through team meetings. Schedule one team meeting to conduct the 5S overview, then proceed with implementation in subsequent team meetings until 5S methods become the norm.
You desire an all-shift kick off implementation meeting. Schedule 5S overview meeting for employees from all shifts. Deliver 5S overview Finalize 5S map. Conduct work area evaluation. Then proceed with implementation in shifts until 5S methods become the norm.

3. Draft “straw man” 5S map.

a. Obtain approved layout of the entire work area.  Verify all relevant dimensions.
b. Coordinate area boundaries.
c. Divide the map into workable sections.
d. Determine the number of people per team (1 team per section).

Notes

IF Then
The 2nd-level manager has prepared a 5S map. Use the boundaries identified.
5S map has not been prepared. Obtain area map from Facilities or draw a map (get boundary approval from your 2nd-level manager).

4. Determine “before 5S” photograph logistics (who, how, and when).

Notes

Consider TIME:

If you are planning And Then
A full day of implementation.   Have photos taken before conducting a 5S overview?
Implementation in steps. You want to have the team present. Wait until after 5S overview, and before initial Sorting activities.

Consider BUDGET:

If you are planning Then
Arrange for support from Photography. Contact Photographer at least two (2) days prior to date needed.
Have the team take photographs. Obtain a camera. Obtain a camera permit (available from Security).

5. Establish visible ways to communicate 5S activities.

Notes

Communicate your plans to the workgroup, especially if you are taking photographs prior to the 5S Overview, so they will understand and feel comfortable with the process. The purpose is to serve as a communication tool.

Examples: Consider having enough room to post:
Bulletin Board 5S Map
Visibility Wall Area Photographs
Notebook/binder Workgroup 5S Action Item Log Area evaluation, etc

6. Coordinate and schedule services required from the support organization(s).

Notes

7.Make a list of internal arrangements to be made.

Notes

8.Draft a timeline for 5S planning and implementation activities.

Notes

9.Communicate your plan to upper management.

Notes

10. Check your work. You will know you have completed this task when:

Notes

Take Area Photographs

Purpose: To provide the team with a photographic record of their work area serving as a baseline to measure improvements from.
When:  Do this per group’s previously determined implementation plan

Materials required to take Area Photograph

Steps Required to take Area Photograph

1. Visually survey the work area.

Notes
Workgroup/individuals have agreed, and are aware their area is being photographed.

2.Determine best photo angle for each section.

Notes
Try to show as much of each section as possible – widest angle.

3.Mark agreed- upon photo angles on the 5S map.

Notes
You will be taking “after 5S” photos from the same angle.

4.Have photos taken.

Notes
Open doors of cabinets, desks, etc.
5.Have photos developed.
6.Post in the 5S communication area.
7.Check your work.
Notes
You will know this task is complete when:

Finalize a 5S Map

Purpose: To assist workgroup and 5S Leader in laying out boundaries and determining team responsibilities for 5S activities.
When: Do this immediately following the 5S Overview.
Materials required to finalise a 5S map

Steps to finalise the 5S map

1. Assemble

2.Post “straw man” 5S map to view.

Notes
For example Flip chart, wall, or whiteboard.

3.Agree on how the work area is divided.

Notes

4.Identify a place on 5S map to write in the names of members for each team.

Notes

5. Record team members’ names for each section on the 5S map.

Notes

6. Post 5S map in the communication area.

7.Check your work.

Notes
You will know you have completed this task when:

Perform Area Evaluation

Purpose: To assist workgroup in assessing their work area’s current condition.
When: Do this after 5S Overview and immediately before Sorting.

Materials required

Steps to perform area evaluation

1.Review “Area Check sheet” for additions and/or deletions needed for team’s work area.

2.Assemble in the work area.

3.Complete “Area Check sheet”

4. Determine “Levels of Excellence” for the work area.

5 File Area Check sheets in 5S document system.

6.Post “Levels of Excellence” in the 5S communication area.

7.Check your work.

Note:
You will know this task is complete when:

5S Area Check sheet

Instructions:

  1. Scribe reads each statement out loud and records team member’s response in the appropriate box. A consensus of the team members is needed for each response.
  2. If team members respond “yes” place a checkmark in the “yes” column for that statement.
  3. Team members respond “no” place a checkmark in the “no” column for that statement.

NOTE: The team can add or delete items from the checklist as appropriate for their area.

Sorting Yes No
Do employees know why these 5S activities are taking place?    
Have criteria been established to distinguish necessary from unnecessary items?    
Have all unnecessary items been removed from the area? Examples:  Excess materials, infrequently used tools, defective materials, personal items, outdated information, etc.    
Do employees understand the procedure for disposing of unnecessary items?    
Do employees understand the benefits to be achieved from these activities?    
Has a reliable method been developed to prevent unnecessary items from accumulating?    
Is there a process for employees to pursue and implement further improvements?    
Simplifying Yes No
Is there a visually marked specified place for everything?    
Is everything in its specified place?    
Is storage well organized and items easily retrievable?    
Are items like tools, materials, and supplies conveniently located?    
Do employees know where items belong?    
Has a process been developed to determine what quantities of each item belongs in the area?    
Is it easy to see (with visual sweep) if items are where they are supposed to be?    
Are visual aids in use? (For example signboards, colour-coding or outlining).    
Sweeping Yes No
Are work/break areas, offices and conference rooms clean and orderly?    
Are floors/carpets swept and free of oil, grease and debris?    
Are tools, machinery, and office equipment clean and in good repair?    
Is trash removed on a timely basis?    
Are manuals, labels, and tags in good condition?    
Are demarcation lines clean and unbroken?    
Are cleaning materials easily accessible?    
Are cleaning guidelines and schedules visible?    
Do employees understand expectations?    
Standardizing Yes No
Are current processes documented?    
Do employees have access to the information they require?    
Is there a method in place to remove outdated material?    
Do employees understand the processes that pertain to them?    
Does a process exist that enables employees the opportunity to improve existing processes?    
Self-Discipline (Sustaining) Yes No
Are safety and housekeeping policies followed?    
Is safety data posted in appropriate locations?    
Are safety risk areas identified?    
Are employees wearing appropriate safety apparel?    
Are fire extinguishers and hoses in working order?    
Is general cleanliness evident?    
Are break areas cleaned after use?    
Do employees know and observe standard procedures?    
Do employees have the training and tools that are necessary to make this program work?    
Is there a confident understanding of and adherence to the 5S’s?    

5S Levels of Excellence

Instructions:

  1. The team discusses the results of the “5S Area Check sheet”(s) completed for all sections of the work area.
  2. The team uses the check sheets as a basis for determining the level of excellence for each of the 5S categories. There is no one-to-one correspondence between the number of marks in the “yes” column on the check sheet(s) and the level of excellence.  The check sheet(s) provides additional information on which to base the team’s subjective opinion.
  3. As levels are determined, write the date in the appropriate column for that level (one level per category).

NOTE:  The “Levels of Excellence” form pertains to the entire work area.  Work area sections are probably at different levels.  When this happens, the entire work area defers to the lowest level. This applies to the area’s overall rating also.

Level Sorting Date
1 Necessary and unnecessary items are mixed together in the work area.  
2 Necessary and unnecessary items separated (includes excess inventory).  
3 All unnecessary items have been removed from the work area.  
4 The method has been established to maintain the work area free of unnecessary items.  
5 Employees continually seeking improvement opportunities.  
Level Simplifying  
1 Tools, supplies and materials randomly located.  
2 Designated location established for all items.  
3 Designated locations are marked to make the organization more visible. (For example colour-coding or outlining)  
4 The method has been established to recognize; with a visual sweep, if items are out of place or exceed quantity limits.  
5 Process in place to provide continual evaluation and to implement improvements.  
Level Sweeping  
1 Factory/Offices and machinery/office equipment are dirty and/or disorganized.  
2 Work/break areas are cleaned on a regularly scheduled basis.  
3 Work/break areas, machinery and office equipment are cleaned daily.  
4 Housekeeping tasks are understood and practised continually.  
5 Area employees have devised a method of preventative cleaning and maintenance.  
Level Standardizing  
1 No attempt is being made to document or improve current processes.  
2 Methods are being improved but changes haven’t been documented.  
3 Changes are being incorporated and documented.  
4 Information on process improvements and reliable methods is shared with employees.  
5 Employees are continually seeking the elimination of waste with all changes documented and information shared with all.  
Level Self-Discipline (Sustaining)  
1 Minimal attention is spent on housekeeping and safety and standard procedures are not consistently followed.  
2 A recognizable effort has been made to improve the condition of the work environment.  
3 Housekeeping, safety policies, and standard procedures have been developed and are utilized.  
4 Follow-through of housekeeping, safety policies, and standard procedures is evident.  
5 The general appearance of confident understanding and adherence to the 5S program  

Sorting Activity – Tagging Technique

Purpose: To assist workgroup in identifying unnecessary items in the work area.

When: Do this after area evaluation and before you conduct the Sorting Auction

Materials Required

Steps for Tagging Technique  

1.Assemble in the work area.

Notes
Clarify criteria for tagging.  Refer to step #2 and expand if necessary.

2.  Team members individually identify unnecessary items in the assigned work area.

Caution: Focus on Company-owned versus the personal property.

Notes

Every individual walks through the assigned area and physically touches everything.  As each item is touched, do the following:

If: Then:
Item has a defined purpose and is used often enough to be considered necessary. Do not tag item.
Item has no defined purpose or is not needed. Tag item.
Item is determined unsafe and needed. Tag item to be repaired or replaced.
Item is unsafe and not needed. Tag item to be removed from the work area
Unsure about the item’s purpose. Tag item for discussion at “Sorting Auction”

3.  Remove all tagged items to the designated holding area for auction.

Notes

If: And: Then:
Single shift  → The auction can take place immediately following tagging activity according to the team’s plan.
  Tagged item is too large for the team to move. Determine the appropriate process for disposition of item during auction walk-through.
Multiple Shifts  → Hold tagged item for the predetermined period before conducting the auction.
List all tagged items and post list in the communication area for all shifts to preview prior to the auction.
  Tagged item is too large for the team to move. Determine the appropriate process for disposition of item during auction walk-through.

4.Check your work.

Notes
You will know you have completed this task when:

Sorting Activity -Sorting Auction

Purpose: To assist auctioneer in conducting Sorting Auction to dispose of tagged items.
When: Do this after “Perform Tagging Technique”.
Materials Required:

Steps for Sorting Action

1.Assemble in the auction area.

2.  Designate 2 scribes.

Notes

3.  Distribute blank surplus form and action item log.

Notes

To designated scribes.

4.  Hold up each item for auction.

Notes

One item is handled at a time.

5.  Ask criteria questions for each item.

Notes
Examples:

6.Dispose of each tagged item.

Notes

If the item is: And: Then follow these steps
Claimed  → Claimant determines a location for the item.
The scribe records action taken on the 5S Action Item Log.
Unclaimed Is still usable. Record the unnecessary item on the surplus form and place in an appropriate container for removal.
Unusable by anyone. Discard immediately.
Do not record on the form.
Item is too large for the team to move. Conduct a walk-through of the area and develop a plan for the disposition of large tagged items.
The scribe records action to be taken on the 5 Action Item Log.

7. Collect Action Item Log

Notes

Post in 5S communication area to be followed up during the next 5S meeting.

8. Distribute copies of the surplus form as appropriate.

Notes

Others may have a need for your surpluses items. Note on the surplus from the date items will be removed from the work area.

9.Remove all unnecessary items from the work area.

Notes
On date determined.

10.Check your work.

Notes

You will know you have completed this task when:

Simplifying Activity – Prepare for Simplifying

Purpose: To assist the workgroup in preparing to organize the work area.
When: Do this after all unnecessary items have been removed from the workplace.
Materials Required

Steps for simplifying the activity

1.  Assemble in the work area.

2.Review section boundaries.

Notes: Refer to 5S Map

3.Review Simplifying criteria

Notes
Consider the following criteria:

4.Distribute 5S Guides for performing Labeling, Outlining and Shadow boards.

Notes

5.Designate a coordinator to order required labels for the entire workgroup.

Notes: Labelling is one of the most common techniques. It is generally best to have one label coordinator for the entire workgroup.

6.Teams are prepared to go to assigned sections.

Notes: Refer to the 5S map.

7.Check your work.

Notes

You will know you have completed this task when:

Simplifying Activity -Using Outlining Technique

 Purpose: To assist workgroup in outlining all appropriate items /areas in the workplace.

When: Do this after locations for all items have been designated according to their use.

Materials Required

Steps to use the outlining technique

1.Assemble in the work area.

2.Identify and agree on the items or areas that require outlining.

Notes:
Examples: (may not be appropriate in all areas)

3.  Outline the items or areas identified.

Notes

4.  Label each item or outlined area.

Notes: Legibly print the name of the outlined item or area on the tape.

5.Check your work.

Notes
You will know that you have completed this task when:

Simplifying Activity -Using LABELING Technique

Purpose:  To assist workgroup in labelling all appropriate items in the workplace.
When: Do this after locations for all items have been designated according to their use.
Materials Required:

Steps for using Labeling Technique

1.Assemble in the work area and designate scribe.

2. Apply temporary labels to ALL items and locations deemed necessary.

Notes
Use masking tape as a temporary label to identify ALL items determined to be necessary for the work area (may not be appropriate in all areas).
Examples:

3. Mark each label

Notes{ Print legibly:

4.  Identify items that require restocking.

Notes: Record on the label when an item should be reordered (by date or by item count)

5.  Prepare a list for ordering permanent labels.

Notes: Print each label legibly and exactly as it should read.

6.  Add order labels to workgroup 5S Action Item Log.

Notes: Add to Action Item Log.

7.  Forward list of label names to label coordinator.

Notes: One person coordinates label generation and/or ordering for the entire work area.

8.  Check your work.

Notes:

You will know you have completed this task when:

Simplifying Activity – Using SHADOW BOARD Technique

Purpose:  To assist workgroup in making a shadow board for organizing supplies and tools in the workplace.  This technique may not be applicable to all areas.

When: Do this after locations for all items have been designated according to their use.

Materials required:

Possible construction materials you might need: Pegboard, Styrofoam, Hooks, Label maker, Plywood,  Cardboard, Form board,  Markers for outlining, Plexiglas case,  Hangers, Masking tape

Steps for using shadow board technique

1.  Assemble in the work area.

2.  Identify what supplies/tools require a shadow board.

Notes:
Examples: (may not be appropriate in all areas)

3.  Have team draft on paper the design of the shadow board.

Notes:
Include in your design:

4.  Post the mock-up of the design in the communication area for everyone to see.

Notes

5.  Gather materials to build the board.

6.  Layout all supplies and tools on the board per the design.

7.  Outline supplies and tools as they will be placed on the board.

Notes:

8.  Label each outlined item and its location with its names.

Notes

9.  Place shadow board in the work area.

Notes: Refer to design for pre-determined location.

10.  Check your work.

Notes: You will know you have completed this task when:

Sweeping Activities -Perform SWEEPING

Purpose:  To assist workgroup in developing daily visual and physical sweeping activities to assess and maintain the work area.
When: Do this after the Simplifying activities have been completed.
Materials Required:

Steps required to perform sweeping

1. Assemble in the meeting area and designate a scribe.

 2.  Prepare a list of “Visual Sweeping” activities that need to occur in the work area.

Notes

3.  Post the finished “Visual Sweeping” list in the 5S communication area.  
Notes: Identify list as “Visual Sweeping” list
4.  Prepare a list of “Physical Sweeping” activities.

5.  Post finished “Physical Sweeping” list in the communication area.
Notes: Identify list as “Physical Sweeping” list.

6.  Check your work.

Notes:
You will know you have completed this task when:

Standardizing Activity – Perform STANDARDIZING Activity

Purpose: To assist workgroup in documenting agreements made during 5S activities and to develop a plan for periodic repetition of 5S activities.

When: Do this after Sweeping Activities

Materials required:

Steps to perform standardizing activity

1.  Assemble in the meeting area and designate a scribe.

 2.  Review and document Sorting activity. Do the following:

Notes

3.  Review and document Simplifying activity.

Notes:

Document agreements (including, but not limited to) those made for:

4.  Review and file Sweeping activity lists.

Notes

5.  Establish a schedule for periodic repetition of 5S activities.

Notes

6.  Check your work.

You will know you have completed this task when:

Notes

Self-Discipline Activity – Team

Purpose To assist workgroup in following through on all 5S agreements made for the work area. When Do this 1-2 weeks after Standardizing Activity has been completed in your area.  Repeat on a regular basis.

Materials required: 

Steps for team self-discipline activity

1.  Assemble in the work area for visual assessment and designate a scribe.

 2.  Determine if the 5S agreements are being followed in the work area.

Notes

Ask, “Are we following the agreements we put in place as a result of our 5S activities?”

IF Then follow these steps
Yes Acknowledge and congratulate
No List those agreements not being followed.
Ask, “Why not?”
Ask, “How can we fix it?”
Document agreed-upon solutions.
Place agreement(s) in the 5S file.”

3.  Develop a plan to address the needed improvements.

Notes

4.  Review Individual Self-Discipline 5S Guide.

Notes

5.  Check your work.

Notes

You will know you have completed this task when:

Self-Discipline Activity – INDIVIDUAL

Purpose:  To assist individuals in applying 5S agreements to the personal work area.

When:  Do this after Standardizing Activity has been completed in your area.

Materials required:

Steps for self-discipline activity

1.  Go to your work area.

Notes: The immediate area where you perform most of your daily activities, i.e. cubicle, bench, etc.

2.  Determine the effectiveness of your individual organizing methods in support of the 5S agreement.

Notes

Considering your own personal work style, ask yourself:

Examples (add/delete as appropriate):

IF Then follow these steps
You are following 5S agreements Ask: “How will I maintain and improve?”
You are not following 5S agreements. Ask: “What steps can I take to  improve?”

3.  Prepare a personal 5S plan.

Notes

4.  Check your work.

Notes

You will know you have completed this task when:

Measure Results

Purpose:  To assist the team in measuring improvements resulting from Implementation of 5S methods.

When: Do this after each completed repetition of 5S activities.

Materials required:

Steps to measure Results

1.  Take “after 5S” photographs.

Notes: Follow all steps in, “Take Area Photographs ”

2.  Complete “after 5S” area evaluation.

Notes:

Follow all steps  “Perform Area Evaluation”
Following the development of “after 5S” photographs and completion of “after 5S” area evaluation, reassemble workgroup in the communication area and continue with Step #3 below.

3.  Analyze results following evaluation.
a)     Review “before” and “after” photos.
b)    Review “before” and “after” evaluations.
c)     Review a list of surplus items.

Notes

4. Acknowledge improvements in your area.

5.  Establish your next “Levels of Excellence” Goal.

Notes

6.  Post your goal in the communication area.

7. Communicate results with upper management.

8.  Check your work.

Notes:

You will know you have completed this task when:

Subscribe to get access

Read more of this content when you subscribe today.

Back to Home Page

If you need assistance or have any doubt and need to ask any questions contact us at preteshbiswas@gmail.com. You can also contribute to this discussion and we shall be very happy to publish them in this blog. Your comment and suggestion are also welcome.

Advertisements

Advertisements