Advertisements
1.PURPOSE: To explain the points to be checked before starting DG set
2. SCOPE: This work instruction is applicable to DG set
3. RESPONSIBILITY: HOD MNT.
4. INSTRUCTIONS: Refer to Manufacturer’s manual For DG set repair and maintenance.
5.ENVIRONMENTAL HEALTH AND SAFETY INSTRUCTION:
- Before entering into D.G room wear Earmuff /earplug.
- While doing maintenance wear hand gloves.
- Avoid open flame in D.G. room.
6. OPERATIONAL CONTROL PLAN:-
| Sr.No | Parameter to be Monitored | Spec. | Freq. of Monitoring | Method of monitoring | Resp. | Record |
| 1 | Emission Level in DG set | PM- 150 mg/Nm3 SO2-50mg/Nm3 | Once in Six Month | External agency | HOD MNT | Report from an external agency |
| 2 | Qty. of Diesel. | – | Daily | Diesel record | HOD MNT | Diesel record |
| 3 | Noise Level a) DG Set | 75 dB | Once in Three Month | External agency | HOD MNT | dB record |
| 4 | Cleaning of duct | Clean | Once in month | Visual | HOD MNT | P.M. record |
7. RECORD REF.: As mentioned above.
Subscribe to get access
Read more of this content when you subscribe today.
Advertisements