OCP for Operation & Maintenance Of DG SET

1.PURPOSE:  To explain the points to be checked before starting DG set
2. SCOPE:  This work instruction is applicable to DG set
3. RESPONSIBILITY: HOD MNT.
4. INSTRUCTIONS: Refer to Manufacturer’s manual For DG set repair and maintenance.

5.ENVIRONMENTAL HEALTH AND SAFETY INSTRUCTION:

  1. Before entering into D.G room wear Earmuff /earplug.
  2. While doing maintenance wear hand gloves.
  3. Avoid open flame in D.G. room.

 6. OPERATIONAL CONTROL PLAN:-

Sr.NoParameter to be MonitoredSpec.Freq. of Monitoring Method of monitoringResp.Record
 1Emission  Level in DG setPM- 150 mg/Nm3
SO2-50mg/Nm3
Once in Six MonthExternal agencyHOD MNTReport from an external agency
 2Qty. of Diesel. DailyDiesel recordHOD MNTDiesel record
 3Noise Level a) DG Set 75 dBOnce in Three MonthExternal agencyHOD MNTdB record
4Cleaning of ductCleanOnce in monthVisualHOD MNTP.M. record

7. RECORD REF.: As mentioned above.

Subscribe to get access

Read more of this content when you subscribe today.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s