Advertisements
1.PURPOSE:
To control spillages and leakages of all types of oil, water, and coolant
2. SCOPE:
This work instruction is applicable to all departments
3. RESPONSIBILITY: Departmental HOD
4. INSTRUCTIONS:
- Ensure the effective preventive maintenance of pipelines, Drainage, and Taps.
- If the leakage of oil informs about leakage to the maintenance supervisor.
- Check gravity of leak physically.
- If the gravity of the leak found more, immediately close the valve and inform the charge of maintenance immediately.
- If necessary stop processing.
- Start work after arresting leakage completely.
- Collect leaked oils in containers and clean the area.
- Avoid spark in the leakage area.
- Do not allow employees to pass on through leaked areas to avoid slippage.
- If leakage from the waterline, carry out a survey to identify water leakages from Pipelines.
- Take corrective measures considering survey reports and arrest leakages.
- If small quantity leakage occurs arrest it immediately.
- If the gravity of the leak found more, immediately close the valve and inform to maintenance in charge.
- If necessary stop processing.
- Start work after arresting leakage completely.
Subscribe to get access
Read more of this content when you subscribe today.
Advertisements