Monitoring and Controlling of Spillages and leakages of all type of oil, coolant, and water

1.PURPOSE:

To control spillages and leakages of all types of oil, water, and coolant

2. SCOPE:

This work instruction is applicable to all departments

3. RESPONSIBILITY:  Departmental HOD

4. INSTRUCTIONS:

  1. Ensure the effective preventive maintenance of pipelines, Drainage, and Taps.
  2. If the leakage of oil informs about leakage to the maintenance supervisor.
  3. Check gravity of leak physically.
  4. If the gravity of the leak found more, immediately close the valve and inform the charge of maintenance immediately.
  5. If necessary stop processing.
  6. Start work after arresting leakage completely.
  7. Collect leaked oils in containers and clean the area.
  8. Avoid spark in the leakage area.
  9. Do not allow employees to pass on through leaked areas to avoid slippage.
  10. If leakage from the waterline, carry out a survey to identify water leakages from Pipelines.
  11. Take corrective measures considering survey reports and arrest leakages.
  12. If small quantity leakage occurs arrest it immediately.
  13. If the gravity of the leak found more, immediately close the valve and inform to maintenance in charge.
  14. If necessary stop processing.
  15. Start work after arresting leakage completely.

Subscribe to get access

Read more of this content when you subscribe today.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s