OCP of Monitoring And Controlling Of Spillages And Leakages Of All Type Of Oil, Coolant, And Water

1.PURPOSE: To control spillages and leakages of all types of oil, water, and coolant

2. SCOPE: This work instruction is applicable to all departments

3. RESPONSIBILITY: Departmental HOD

4. INSTRUCTIONS:

  1. Ensure the effective preventive maintenance of pipelines, Drainage, and Taps.
  2. If the leakage of oil informs about leakage to the maintenance supervisor.
  3. Check gravity of leak physically.
  4. If the gravity of leak found more, immediately close the valve and inform to in charge maintenance immediately.
  5. If necessary stop processing.
  6. Start work after arresting leakage completely.
  7. Collect leaked oils in containers and clean the area.
  8. Avoid parking in the leakage area.
  9. Do not allow employees to pass on through leaked area to avoid slippage.
  10. If leakage from the water line, carry out a survey to identify water leakages from Pipelines.
  11. Take corrective measures considering survey report and arrest leakages.
  12. If small quantity leakage occurs arrest it immediately.
  13. If the gravity of leak found more, immediately close the valve and inform to maintenance in charge.
  14. If necessary stop processing.
  15. Start work after arresting leakage completely.

5. RELATED RECORDS:
Preventive Maintenance records

6. CHECKING, CORRECTIVE AND PREVENTIVE ACTION:

In charge, Admin shall ensure implementation of the above procedure. In case of any deviation, initiate corrective and preventive action.

 

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s